Stages and deadlines

Implementation of the village

2022-2024

Stage 1

Designing an eco-cottage, participating in competitions, conferences and exhibitions with a VR showroom
More details about the stage implementation status:
Architectural concept developed
An album of landscaping of a typical site has been developed
Participation in the architectural competition "Golden Ratio 2023"
01
02
03

2025-2027

Stage 2

Design and construction of an eco-village of the future, certification according to the green standards
More details about the stage implementation status:
The plot has been purchased
The concept of the hotel/settlement plan and adjacent infrastructure "Zvenigorod" has been developed
01
02

2028-2035

Stage 3

Design and construction of sustainable eco-cities of the future
N.K. Roerich "Zvenigorod"
More details about the stages can be found in the presentation

Construction regions

Project geography

Solar activity, kWh/m
1,5
2
2,5
3
3,5
4
4,5
5
5,5
Rostov-on-Don
Far East
Yakutia
Siberia (Southern)
Krasnodar
Sochi
Kazakhstan
Uzbekistan
Azerbaijan
and other countries with high solar activity

Altai, Uimon Valley

Location of Zvenigorod in the concept of N.K. Roerich

Eco village

21 cottages

3 hectares

Altai, Uimon Valley

Location of Zvenigorod in the concept of N.K. Roerich

Eco village

21 cottages

3 hectares

"Altai is not only the pearl of Siberia, but also the pearl of Asia. A great future is destined for this wonderful center. The valley between Uimon and Katanda will be the site of a large center"
About a century ago, in one of his letters to Bulgakov, N.K. Roerich wrote:

The project allows you to save on:

Economics of the project

Off-site networks and technical specifications
On-site networks
Construction volume of the building
Capacities of internal engineering systems and energy costs
Automation of building construction
Operating costs
Interest-free, direct financing

Manager and inspired of the project

Dmitry Luchansky

Email
Phone
Contact information

Inspired and want to know more about the project?

Learn more

Download the presentsation in which you will find answers to all the most important questions
Luchansky Dmitry Veniaminovich. 2023 All rights reserved.